Interconnection · South Carolina

Solar interconnection in South Carolina, in plain English.

The agreement is between the account holder and the utility on the bill. It covers who signs, when the system may be turned on, and what happens if the house is sold.

Rules checked October 2026. Rules change, so confirm your tariff with your utility. Detail Solar isn't affiliated with any utility, and the utility decides every interconnection request.

The agreement

What is a solar interconnection agreement?

It is the contract that lets a home system run in parallel with the utility's lines. In South Carolina the form depends on the name printed on the electric bill.

Duke Energy Carolinas, Duke Energy Progress, and Dominion Energy South Carolina use the South Carolina Generator Interconnection Procedures. Home systems of 20 kW AC or less use the Section 2 process and Attachment 7, the request and terms for certified inverter-based facilities no larger than 20 kW. Santee Cooper, the electric cooperatives, and municipal utilities such as Greer CPW use their own applications.

S.C. Code Title 58, Chapter 40, from the Energy Freedom Act, defines a customer-generator to include an energy storage device configured to charge solely from an onsite renewable resource. Residential systems under that chapter are capped at 20 kW AC. Customers of utilities covered by the chapter may use the energy they generate behind the meter without penalty. Utilities with fewer than 100,000 accounts sit outside that section. Each distribution cooperative's board adopts its own policy.

Who signs it

The homeowner or the person on the account signs. On Duke Energy and Dominion Energy's Attachment 7, that Interconnection Customer certifies the request and agrees to the terms. The utility signs a contingent approval. Blue Ridge Electric has the member and the cooperative both sign. Laurens Electric, Broad River Electric, and Berkeley Electric require the member or account holder to sign.

We help you understand what your utility needs. The account holder is the one who signs. The utility decides the request. Detail Solar is not affiliated with any utility.

Permission to operate

Do not flip the switch early. The local electrical inspector signs the certificate of completion. That certificate, the electrician's information, and the signed electrical permit go back to the utility. The utility may witness a test. Otherwise it issues a written approval to energize. Duke Energy calls that permission to operate. The procedures say the customer is not authorized to energize until that notice is received.

Berkeley Electric says not to energize until the bi-directional meter is installed. Blue Ridge Electric and Laurens Electric send a permission-to-operate letter after inspection and the meter. The procedures also require proof of homeowner liability coverage. There is an application fee. The 2025 procedures changed it, so the amount belongs on the current form, not on this page.

Changes

Adding a battery or changing an inverter

Adding a battery or changing an inverter usually means paperwork with your utility before it is turned on. The utility decides what review is needed.

Under the procedures Duke and Dominion use, a material modification needs written authorization first. That includes a non-like-kind inverter replacement, a change to inverter specifications or control settings, an increase in AC output, or a reduction of more than 10 percent. A like-kind panel or inverter swap is not a material modification. The 2025 text says DC-coupled storage that does not change maximum generating capacity, the production profile, or the AC configuration is not one either. An AC-coupled battery can still need review. Duke's riders also ask for written notice within 60 days when the nameplate changes. Greer CPW says the customer submits a new application at least 30 days before modifying the system's rating.

How that looks when the panels are already up is onadd a battery to existing solar. Duke's rate plans are onDuke Energy Solar Choice.

Selling or buying a home with solar

These agreements generally do not travel with the deed. Under Attachment 7, the agreement does not survive the transfer of ownership. The new owner submits a new interconnection request within 20 business days. A new study or inspection is not required unless a material modification happened. Technical requirements stay in place when capacity, electrical characteristics, and facilities are unchanged.

Santee Cooper's solar manual says the next homeowner signs an amended interconnection agreement and receives the credits in the current distributed-generation rider. The buyer does not keep the old credit terms. Greer CPW asks for written notice 30 days before an ownership change. The new owner assumes the agreement in writing or signs a new one, and is not permitted to net meter or begin parallel operation until then.

On Duke Energy, the dates that control an older net-metering rider follow the original application date, including for a later owner. ReadSolar Choice and the transition riderbefore you assume the old plan came with the house.

If the installer is gone

The agreement is with you and the utility. It stays in place when the installer cannot be reached. Under the terms Duke Energy and Dominion Energy use, the utility may terminate the agreement if the facility fails to operate for any consecutive 12-month period. That is a right the agreement gives the utility. It is not a statement that the utility will use it.

If the system has been sitting, start withorphaned systemsand then read the agreement on the account. A new roof that takes the array down and puts it back can also be something the utility wants notice of. That solar work isdetach and reset. Repair of the equipment itself ishome solar panel repair, and storage that is already installed and misbehaving isbattery storage repair.

By utility

Your utility, your rules

The bill names the utility. Each row is the public agreement or policy, with a link to the utility's own page. Town notes forGreenville,Greer, andEasleystart from that same bill.Detail Solar LLC serves all of South Carolina from 1609 Rutherford Road, Greenville, SC 29609.

Each line checked October 2026. On a phone, swipe sideways. The utility name stays put.
UtilityAgreementWhat to know
Duke Energy Carolinas and Duke Energy Progress (SC)SCGIP Section 2, Attachment 7Account holder signs. Written approval to energize, which Duke calls permission to operate, before the system runs.
Dominion Energy South CarolinaSame SCGIP proceduresThe rider requires the customer to execute an interconnection application and agreement before receiving service.
Santee CooperInterconnection request, then review and acceptance testingThe next homeowner signs an amended agreement and receives the credits in the current rider.
Blue Ridge ElectricRider for interconnected small member-owned renewable generationMember and co-op both sign. A permission-to-operate letter follows inspection and the meter.
Laurens ElectricSolar and battery interconnection; RGS Net Billing RiderMember signs. Permission to operate follows approval to install, the county release, and the meter.
Broad River ElectricNet Billing PolicyAccount holder signs the application and the agreement.
York ElectricApplication to interconnect small generation, 100 kW or lessApplication and agreement. Confirm the current form with York.
Berkeley ElectricRenewable Surplus Rider for new installsMember signature required. Do not energize until the bi-directional meter is installed.
Palmetto ElectricNet Billing Rider; legacy net metering through Dec. 31, 2027New installs use net billing. Legacy net metering then moves to net billing.
Greer CPWTier 1 residential application and standard interconnection agreementLocal inspection and proof of liability coverage before parallel operation. New application at least 30 days before a rating change.
Easley Combined UtilitiesAsk ECU for the application and agreementNo public interconnection policy page was found. Call ECU at (864) 859-4013.

Questions

Do I need a new agreement if I buy a house with solar?

Usually, yes. Under the procedures Duke Energy and Dominion Energy use, the agreement does not survive the transfer of ownership. The new owner submits a new interconnection request within 20 business days. Santee Cooper requires the next homeowner to sign an amended agreement. Greer CPW does not allow net metering or parallel operation until the new owner assumes the agreement in writing or signs a new one. Confirm the steps with the utility on the bill.

Can I turn my system on before the utility approves it?

No. For Duke Energy and Dominion Energy, you are not authorized to energize until the utility sends written approval to energize. Duke calls that permission to operate. Berkeley Electric says not to energize until the bi-directional meter is installed. Other utilities send their own permission-to-operate letter. Wait for that writing.

Does adding a battery need utility approval?

Usually there is paperwork first. Your utility decides what review is needed. A battery or an inverter change can be a material modification, which needs written authorization before it is turned on. Some DC-coupled storage that does not change capacity or the AC setup is not a material modification under the 2025 procedures. Ask the utility on your bill before anyone energizes the new equipment.

What happens if my system has been off for a long time?

Under the terms Duke Energy and Dominion Energy use, the utility may terminate the agreement if the system fails to operate for any consecutive 12-month period. That is a right in the agreement. It is not a statement that the utility will use it. If you cannot reach the installer, see our orphaned systems page and read the agreement on your account.

Who is responsible for the interconnection request?

The homeowner or account holder signs it. We help you understand what your utility needs. We are not affiliated with the utility. The utility decides every request.

Related

(864) 283-0070 · Detail Solar LLC, 1609 Rutherford Road, Greenville, SC 29609. We help you understand the form. The utility decides.